Key Capital
Area: 8000 sq. ft.
Place: St. Stephens Green, Dublin 2.
Duration: 7 weeks.
Works included design and build
Works included design and build Demolition of 2no floors, recabling and install of 200no cat 6 data points, new suspended ceilings, alrerations of existing air conditioning and install of new units,new lighting,install of new double glazed partitions and solid partitions(8 meeting rooms),branding included, install of new kitchen and shower room.Install of new carpet plank tiles throughout and Allura plank tile in kitchen area. Install of CCTV,Intruder alarm and alterations to existing fire alarm.Install of all new furniture including desking,seating, sofas and bespoke furniture. Painting and decorating.
VERSION 1
Area: 4000 sq.ft.
Place: Millennium House Dublin 1
Duration: 3 weeks
Works in design and build
Alterations included demolition of existing meeting rooms to create open plan area in full,install of new oak flooring,new kitchen,alterations of existing lighting and install of same, alteration to existing cabling and install of 400no new cat6 data points, Install of 60no new desking(Bench) with glazed edged screens and 60no mesh back chairs. Painting and decorating. Branding. Install of new Intruder alarm and alterations to existing Fire alarm. Install of new access control.
ONE51
Area: 6000 sq ft.
Place: St. Stephens Green, Dublin 2.
Duration: 6 weeks
Works included design and build.
Demolition of 1 no. floor, re-cabling and re-using of existing and installation of 300 no. of cat 6 data points,install of new suspended ceiling tile and grid,alterations to existing air conditioning and install of new units,new LED Lighting throughout,install of new offices 8 no,new meeting rooms including boardroom double glazed and solid partitions, comms room and new kitchen. Branding included.Install of Intercom,Intruder alarm,access control and alterations to existing fire alarm.Install of new furniture including seating, sofa's, desking, bespoke tables and paneling. Painting and decorating.